• IchNichtenLichten@lemmy.world
    link
    fedilink
    English
    arrow-up
    5
    ·
    6 months ago

    I read that there’s a huge backlog in the UK for new connections to the grid for solar farms because the infrastructure isn’t there due to a lack of investment. Sounds like the other side of the same coin.