    You’d be surprised, how fragile critical infrastructure often is. There was an incident in Europe a few years ago, where a single miscalculation in a planned power line shutdown almost caused the entire European grid to split.

    • Boomkop3@reddthat.com
      link
      fedilink
      arrow-up
      6
      ·
      28 days ago

      It slowed down a bit, and then we quickly learned that maintaining the perfect 50hz wasn’t actually necessary anymore. Few people still have clocks that depend on it

      • leisesprecher@feddit.org
        link
        fedilink
        arrow-up
        4
        ·
        28 days ago

        I’m not talking about the incident in Romania, but in Germany.

        A shipyard needed some wires over a river deactivated and that caused an overload cascade, because the river was the border between two providers who had different assumptions about the capacity of the power lines connecting them.